Plan personnel deployment and shifts

Audit safety - The Finito software lets you carry out all your shift planning. A shift plan consists of shift type, shift group, and shift operating mode on a timeline.

Shift operating modes include, for example, two-shift operation, three-shift operation, or a combination of both. Shift types consist of early, late, and night shifts,   defined by a starting point and a duration.

As an option, shift workers can be assigned to shift groups. Shift groups have freely configurable designations, e.g. A, B, C, D, E.

Each shift plan model can be interrupted at random or combined with special shifts (e.g. with maintenance or standstill times).